Skip to content

All the news that matters, in plain English.

Latest

BEAD hub

BEAD public-documents archive

The citable primary documents behind our BEAD reporting — final proposals, award documents, NTIA approvals and guidance, and broadband-office releases — kept at permanent Flip News URLs. Governments restructure their websites and break links; link rot compounds in our favour until this is the archive of record.

Archive opened 24 September 2026. Every entry live-verified 24 September 2026.

How we keep it

  • Mirrors where possible. PDFs are hosted locally at permanent /documents/bead/ URLs; the official source is linked on every entry so readers can always check the original.
  • Versioned documents stay honest. Where a document is superseded — or may soon be — the entry says so. Replacements get a new entry; the old one is marked superseded, never silently edited.
  • Labels are the issuer's. Provisional, draft and contingent awards are labelled with the issuing office's own words, never upgraded by us. See also how we cover BEAD.
  • Growth. New primary documents are added as our BEAD Money Tracker watch turns them up; future runs re-check every official link.

The archive (11 documents)

  1. Closing the Digital Divide Once and for All: NTIA Announces All 56 BEAD Final Proposals Now Approved

    Issuing office
    National Telecommunications and Information Administration (NTIA)
    Document date
    25 August 2026
    Format
    Press release (official page)
    Note
    Notes Illinois as the final approval; quotes NTIA Administrator Arielle Roth.
  2. BEAD Post-Award Office Hours & Roundtables FAQs

    Issuing office
    FloridaCommerce, Office of Broadband
    Document date
    30 June 2026 (Version 22)
    Format
    PDF — mirrored
    Flip News mirror
    Download the archived PDF (430,655 bytes)
    Superseded by
    Possibly superseded: FloridaCommerce updates these FAQs after each office-hours session — check the Office of Broadband's BEAD page for a newer version.
    Note
    Uses the state's own label “provisional awardees”; the end-July-2026 contract target is unconfirmed by any publication.
  3. Draft BEAD subgrant award agreement template

    Issuing office
    FloridaCommerce, Office of Broadband
    Document date
    30 June 2026
    Format
    PDF — mirrored
    Flip News mirror
    Download the archived PDF (971,406 bytes)
    Note
    A draft template, not an executed agreement; shown here so readers can see the state's standard terms.
  4. Governor Ivey Announces Approval of Final BEAD Broadband Proposal, Awards $460 Million to Expand Access to High-Speed Internet

    Issuing office
    Office of Governor Kay Ivey, Alabama
    Document date
    March 2026
    Format
    Press release (official page)
    Note
    The state's own framing; ~$460 million to 15 providers for ~92,000 locations. We treat these as “preliminarily approved” until Alabama publishes a final award list — our watch log records the state's label.
  5. Governor Kehoe Announces Approval of More Than $814 Million to Expand Broadband Access

    Issuing office
    Office of Governor Mike Kehoe, Missouri
    Document date
    6 January 2026
    Format
    Press release (official page)
    Note
    Release states NTIA approved Missouri's Final Proposal on 6 January 2026; the state's BEAD page still labels awards “provisional”.
  6. Governor Josh Stein Unlocks More Than $300 Million for Broadband Expansion Projects

    Issuing office
    Office of Governor Josh Stein, North Carolina
    Document date
    22 December 2025
    Format
    Press release (official page)
    Note
    The state's own caveat, recorded verbatim: “all awards are contingent until they are contracted by the division in 2026.”
  7. CPUC Finalizes BEAD Plan to Secure Up Billions for Statewide Broadband Expansion

    Issuing office
    California Public Utilities Commission
    Document date
    18 December 2025
    Format
    News release (official page)
    Note
    Authorizes submission of California's BEAD Final Proposal (Resolution T-17898, below) to NTIA.
  8. Resolution T-17898: requesting approval from the Commission to submit the BEAD Final Proposal to NTIA

    Issuing office
    California Public Utilities Commission
    Document date
    Adopted 18 December 2025 (dated 19 December 2025, Sacramento)
    Format
    Resolution PDF (official page)
    Mirror status
    Local mirror pending: the CPUC documents host was unreachable from our archive build on 24 September 2026. Linked to the signed official PDF at docs.cpuc.ca.gov.
  9. NTIA Announces Approval of Texas' BEAD Final Proposal

    Issuing office
    National Telecommunications and Information Administration (NTIA)
    Document date
    20 November 2025
    Format
    Press release (official page)
    Note
    Subtitle: “Thanks to Benefit of the Bargain Reforms, Texas Saves $2 Billion while Achieving Universal Connectivity.”
  10. BEAD Final Proposal — Version 7.0

    Issuing office
    ConnectLA — Louisiana Office of Broadband Development & Connectivity
    Document date
    18 November 2025
    Format
    PDF — mirrored
    Flip News mirror
    Download the archived PDF (1,056,907 bytes)
    Superseded by
    No newer version found as of 24 September 2026 — v7.0 is the latest Final Proposal (the “V8.0” document in circulation is a different paper: the GUMBO 2.0 supplemental notice).
    Note
    Post-restructure document: its version history incorporates NTIA's 6 June 2025 BEAD Restructuring Policy Notice. Anchors our Louisiana award rows in release 2026.09.23.1.
  11. BEAD Restructuring Policy Notice

    Issuing office
    National Telecommunications and Information Administration (NTIA)
    Document date
    6 June 2025
    Format
    Policy notice (official document page)
    Mirror status
    No local mirror: the raw PDF path was unreachable on 24 September 2026; linked to NTIA's official document page, which carries the download.
    Note
    The June 2025 rule that reshaped BEAD's award rules — cited by Louisiana's v7.0 version history. A 17 December 2025 GAO finding treats it as a rule subject to congressional review; it remains in effect.

Our own datasets

The award data we transcribe from documents like these is published as versioned, immutable dataset releases: awards.csv and awards.json (release 2026.09.23.1, 29 Texas + Louisiana rows), rendered in the BEAD Money Tracker. Spotted a document we should archive, or something wrong with an entry? Tell us — corrections are logged publicly on our corrections log.